Bathroom with limited attic access. Required access from below to mount hardware to joists.
- 1 – Drop rods extending through ceiling
- 2 – Finished ceiling with kwiktrak attachments
- 3 – Finished Installation
- 4- Finished Installation over shower
This job took 3 days due to the limited attic access which required the use of an outside contractor to tape and finish the ceiling as well as moving the shower light and vent.