Installations

Bathroom with limited attic access. Required access from below to mount hardware to joists.

This job took 3 days due to the limited attic access which required the use of an outside contractor to tape and finish the ceiling as well as moving the shower light and vent.

FacebookTwitterGoogle+Share

Leave a Reply

Your email address will not be published. Required fields are marked *

*